RonaDeck Resin Bound Surfacing was laid in Leicester Cathedral Gardens as part of a £2.5 million project transforming the city’s cathedral quarter and providing a connection to the new Richard III visitor centre.
RonaDeck Resin Bound Surfacing has played a role in creating an attractive public space that can be enjoyed by visitors to the cathedral or the Richard III visitor centre and the people of Leicester in general.
RonaScreed FastDry Prompt – benefits and drying
RonaScreed FastDry Prompt (formerly RonaScreed 8 Day Overlay) is so-called because it is a fast-drying screed additive which enables a 50mm thickness of 3:1 sand/ cement screed to be overlaid with moi ...
Read moreBS 8204-1 “Concrete bases and cementitious levelling screeds to receive floorings — Code of practice” section 6.11.1 suggests the following calculation for drying of screeds with no fast drying additi ...
Read moreAvoidance/ Mitigation Of The Effects Of Common Forms Of Cracking In Cementitious Screeds
Aggregate is usually 0–4 mm and is mixed with cement in the ratio of 1:3 or 1:4 cement to sand, depending on strength requirements and drying requirements. For total screed thicknesses in excess of 50 ...
Read moreHere to help...