21 Moorfields

London

21 Moorfields is a new commercial development in the City of London made up of offices and high-quality retail space. The building sits directly above the London Underground and also a new Crossrail ticket hall. A selection of our specialist screed products was specified for use on this complicated project due to the high strengths gained at a low depth and fast-drying properties.

RonaScreed FastDry Prompt – benefits and drying

RonaScreed FastDry Prompt (formerly RonaScreed 8 Day Overlay) is so-called because it is a fast-drying screed additive which enables a 50mm thickness of 3:1 sand/ cement screed to be overlaid with moi ...

Read more

Drying of Screeds

BS 8204-1 “Concrete bases and cementitious levelling screeds to receive floorings — Code of practice” section 6.11.1 suggests the following calculation for drying of screeds with no fast drying additi ...

Read more

Avoidance/ Mitigation Of The Effects Of Common Forms Of Cracking In Cementitious Screeds

Aggregate is usually 0–4 mm and is mixed with cement in the ratio of 1:3 or 1:4 cement to sand, depending on strength requirements and drying requirements. For total screed thicknesses in excess of 50 ...

Read more

Here to help...