Yorkshire Wildlife Park

Doncaster

Ronacrete Approved Contractor BIF Services installed 2,838m2 of RonaDeck Resin Bonded Surfacing & 2,540m2 of RonaDeck Resin Bound Surfacing to a new Visitor Centre at the Yorkshire Wildlife Park near Doncaster.

 

RonaDeck Resin Bonded Surfacing was specified for the main concourse & pathways leading from parking areas and emphasis given to the central retail area, with 3 different, contrasting aggregate colours to highlight entrance points and add visual interest.

 

The central area also includes an amphitheatre, where RonaDeck Resin Bound Surfacing was applied to surround benching to provide a natural-looking, decorative floor with added slip resistance.

RonaScreed FastDry Prompt – benefits and drying

RonaScreed FastDry Prompt (formerly RonaScreed 8 Day Overlay) is so-called because it is a fast-drying screed additive which enables a 50mm thickness of 3:1 sand/ cement screed to be overlaid with moi ...

Read more

Drying of Screeds

BS 8204-1 “Concrete bases and cementitious levelling screeds to receive floorings — Code of practice” section 6.11.1 suggests the following calculation for drying of screeds with no fast drying additi ...

Read more

Avoidance/ Mitigation Of The Effects Of Common Forms Of Cracking In Cementitious Screeds

Aggregate is usually 0–4 mm and is mixed with cement in the ratio of 1:3 or 1:4 cement to sand, depending on strength requirements and drying requirements. For total screed thicknesses in excess of 50 ...

Read more

Here to help...